Funding entity ATISAE
Participated by API S.A.
This project consists of a Motion and Time Study at pressing line operations. This pressing line provides the metal base of traffic signals. This project has been developed for API FABRICACIÓN S.A. at Aranjuez.
This project distinguishes among different sizes and shapes of traffic signals. Next, results obtained from the analysis of the pressing line:
1. Process diagrams at pressing, cutting and drilling operations
2. Timekeeping repetitive operations
3. Analyzing main factors on operations
4. Quantification of factor’s influences
5. Providing operation standard times
6. Comparison between obtained results and historic values
API_MMTT